What do you do at a pre-construction meeting

During the pre-construction meeting, the discussion matters typically are the introduction to the project and project owner, roles and responsibilities of the project team, chains of command and communication channels, document reviews, and any other business.

What is discussed at a preconstruction meeting?

You can tell a lot about a project by the preconstruction meeting questions that come up. You might also get many other questions about the project’s scope, the specifications, the schedule, safety requirements, and the processes to follow for all communications aspects.

Who runs a preconstruction meeting?

It’s important that you are meeting with the chief decision maker – often the company owner or partner – as well as the person who will be on-site every day running the job. In a small company that may be one and the same person.

What is a pre build meeting?

Your pre-construction meeting is the meeting you’ll have with your builder just before (or right as) construction begins. With some builders, this meeting takes place before any work begins on your home at all.

What should I bring to a pre-construction meeting?

  1. Chain of command.
  2. Quality control roles and responsibilities.
  3. Introduction to the owner.
  4. Document review.
  5. Q&A.

What happens at a pre drywall meeting?

Your pre-drywall meeting is just what you think—the meeting before all of your drywall goes in. You’ll be walking through the house at its framed stage—complete with wall studs, roof, electrical, and plumbing.

How do you start a pre-construction meeting?

  1. Set up the invites. …
  2. Prepare for the meeting. …
  3. Check the contract. …
  4. Go over responsibilities. …
  5. Outline the day to day.

What are the five phases of construction?

  • Project Initiation and Conception. …
  • Project Planning and Definition. …
  • Project Execution and Launch. …
  • Project Performance. …
  • Project Close.

What is the purpose of site inspection and pre-construction meeting?

Construction site inspections are critical to ensuring that quality and safety procedures are followed correctly from the start. Construction projects involve coordinating multiple project team members, materials, and equipment, which may expose contractors to many potential risks and hazards.

What is meant by pre-construction activities?

Pre-construction is the time to thoroughly assess and plan to mitigate risks associated with constructing the project, including evaluation of the construction site, permit and inspection requirements, and any other special situations that need to be resolved before or during construction.

Article first time published on

What do pre drywall meetings look for?

  1. electrical wiring and junction box placement;
  2. framing;
  3. foundation slabs, walls and drains;
  4. footings;
  5. notching of floor joists;
  6. firestop material;
  7. pier pads;
  8. crawlspace;

How long does it take to finish a house after pre drywall inspection?

He said – lots of variability due to weather before drywall but you can usually count on 2 months after drywall to be completed.

What is included in pre-construction services?

  • Preliminary planning.
  • Program and project management.
  • Design management (planning, design, programming, interior design)
  • Estimating.
  • Budget development and management.
  • Zoning, permitting, and municipality representation/approvals.
  • Scheduling.
  • Value-engineering.

What does pre-construction information include?

The pre-construction information contains health and safety information that the client has or can obtain, that is necessary for the work to be carried out safely. This could include health and safety information on the site, like ground conditions, hazardous materials, or service locations.

What are the 7 stages of construction?

This course describes the fundamental elements of a project’s lifecycle stages, including Stage 1 – Conception, Stage 2 – Planning & Design, Stage 3 – Construction, Stage 4 – Commissioning & Turnover, Stage 5 – Occupancy or Use, Stage 6 – Renewal, and Stage 7 – Demolition.

What are the 6 stages of construction?

  • Project conception, design, and planning. …
  • Building Permits. …
  • Pre-construction phase. …
  • Procurement. …
  • Construction Phase. …
  • Post-Construction.

What is the final step in construction?

The Post-Construction/ Closeout Phase. The project closure phase of the project is the last step in the long process of designing and completing a construction project. Now that all the work on the job site has been completed, the project will come to a close.

Who is involved in the pre-construction phase?

Contractors have duties at the pre-construction phase. And the pre-construction phase is when the principal designer and the principal contractor are appointed. In fact, you can’t skimp on the pre-construction phase.

Which of the following tasks is usually done during pre-construction?

The Pre-Construction phase includes 1) developing a plan for the project, 2) creating a design for the project, 3) securing land/entitlements/permits and 4) procuring the team, financing, materials and labor required for construction to begin.

What does pre-construction negotiated mean?

Pre-construction services grew out of construction cost estimating to encompass the other activities in planning a project. The intent is to work with the project’s owner to help deliver a satisfactory project that meets the owner’s objectives.

How long does it take to complete a house after drywall?

Interior finishing – This is when the inside of your house starts to look like a house, with the drywall and most of the carpentry completed. Expect about two months. Finish work – Everything is coming together now!

How long does it take to drywall a new construction house?

Generally, it takes a drywalling crew six days to four weeks to drywall a new home. The following factors all influence how long drywalling takes: Home size. Framing complexity.

What is pre wall construction?

Wall sections and pre-wall installations are always custom-made for the building and are usually delivered complete with piping and all the necessary fittings, such as water meters or ventilation. G. … Here too, the wall sections are individually tailored to the containers.

What should I ask at pre drywall inspection?

  • HVAC Units. Heating, ventilation, and air conditioning — known as HVAC in the construction industry — are something you need to consider during your pre-drywall inspection. …
  • Plumbing System. …
  • Dishwasher Issues. …
  • Electrical Problems. …
  • Problems With the Floor. …
  • Wall Issues. …
  • Roof Problems. …
  • Foundation Issues.

What happens after drywall in new construction?

Once the drywall is completed, other exterior finishes can be installed, such as stucco or siding. Cabinets and flooring follow, as well as bathroom finishes, like sinks, tubs and toilets.

What's the difference in sheetrock and drywall?

Drywall is a flat panel made of gypsum plaster sandwiched in between two sheets of thick paper. It adheres to metal or wood studs using nails or screws. Sheetrock is a specific brand of drywall sheet. These terms are often used interchangeably.